Kitchen Remodeling in NYC

Custom cabinetry, slab quartz and marble countertops, gas relocations, range-hood venting, full appliance coordination.

5.0

What we build

Three kitchen builds. One standard.

Full guts to cabinetry refreshes — same cabinetry sequencing, same gas-and-electric rough-in, same finish standard. The scope changes how long it runs; it doesn't change how it gets built.

  • Full kitchen gut renovation — modern handleless cabinetry, marble waterfall island, suspended hood, integrated double-oven wall

    Full kitchen gut renovations

    Down to the studs. New layout, new plumbing, new gas, new electrical, new range-hood venting. Full custom or semi-custom cabinetry, slab countertops, integrated appliances, statement lighting, and tile or stone backsplash.

  • Brooklyn townhouse kitchen with custom shaker cabinetry, polished marble floor, panel-front refrigeration

    Cabinetry refreshes

    Cabinets in good shape, but the doors and drawer fronts are dated. Re-door, re-drawer-front, new hardware, new countertops, new backsplash. The carcasses stay; everything visible changes.

  • Modern kitchen island with marble waterfall countertop, dark wood ledge, and double-oven wall

    Countertop & backsplash

    Single-element kitchen work. Slab quartz, marble, or solid surface countertops. Hand-laid mosaic or large-format tile backsplash. Templated, fabricated, and installed in a focused window.

Materials & Standards

Five standards. No shortcuts.

Kitchens are the most coordination-heavy project we run. Cabinetry lead times, appliance availability, and gas-line permits all have to line up before demo. The material standard is what holds the schedule together.

  • Custom shaker cabinetry installed in a Brooklyn townhouse kitchen

    Cabinetry.

    Custom millwork from partner shops; semi-custom from Rutt, Christopher Peacock, Wood-Mode on the high end. Lead times built into the design phase, never the demo phase.

  • Bookmatched marble slab — countertop and waterfall edge stock

    Countertops.

    Calacatta, Carrara, statuario, Taj Mahal, soapstone on the natural side. Slab quartz from Caesarstone, Cambria, Silestone on the engineered side. Custom edges (waterfall, mitred, eased, ogee).

  • Backsplash tile detail — hand-laid mosaic before grout

    Backsplash.

    Slab continuation, hand-laid mosaic, large-format porcelain, hand-glazed ceramic, natural stone tile. Mitred outside corners on stone. Grout colors confirmed against a wet sample.

  • Modern kitchen with integrated double-oven wall and panel-front refrigeration

    Appliances.

    Sub-Zero, Wolf, Miele, Thermador, Bosch, Bertazzoni, GE Monogram, JennAir. Stainless and integrated panel-front options across every line. Warranty registered on every installed unit.

  • Brass kitchen fixture detail — pressure-tested supply lines and lever-handled valve

    Fixtures.

    Brizo, Kohler, Waterworks, Rohl, Newport Brass. Brass, bronze, and stainless supply lines pressure-tested before walls close. Statement designer pieces when the brief calls for them.

Process

Four steps. No surprises.

Same four-step process as every project — but kitchens have a longer design phase because the cabinetry order has to go in 8 to 12 weeks before demo. We sequence it so the cabinetry arrives the week the demo wraps.

  1. Free consultation

    On site or by video. We measure, photograph, and walk through scope, layout ideas, and cabinetry direction.

  2. Design and scope

    Floor plan, elevations, cabinetry layout, appliance spec, finish selections in three tiers, and a written line-item proposal.

  3. Cabinetry order placed

    While the cabinetry is in fabrication, we file DOB permits, coordinate appliance delivery, and stage the alteration agreement work for co-op or condo builds.

  4. Build, walk-through, warranty

    Demo, rough-in, drywall, tile and stone, cabinetry install, countertop template and install, appliance install, punch — followed by the 2-year written workmanship warranty.

Featured Projects

Recent kitchen builds. Built to last.

A few recent builds. Each links to a full case study with cabinetry source, countertop slab, appliance spec, and timeline.

Service Areas

Where we build.

We’re based in Newark, NJ, and we work across the NYC metro from there. Five boroughs, Long Island, Yonkers, and northern New Jersey are all on the standard route.

And 30+ surrounding cities within a 50-mile radius of Newark, NJ

FAQs

Common questions.

Everything we get asked about scope, timeline, materials, and how the work actually runs.

How long does a kitchen remodel take in NYC?

Kitchen projects can take from 2 weeks for partial updates up to 14 weeks for full custom kitchens with cabinetry, appliances, and finish work.

Do you build custom cabinetry, or do you install stock?

Both. Full custom cabinetry is built by partner millwork shops we've worked with for years, drawn to your kitchen's exact dimensions and finished in your specified species and stain. Semi-custom and stock options come from manufacturers we've vetted on dozens of projects — Rutt, Christopher Peacock, Wood-Mode on the high end, plus several mid-range lines. We'll match the cabinetry tier to the rest of the build's allocation.

Marble or quartz countertops — which one should I pick?

Marble looks like nothing else and ages with character — but it etches with acid (lemon, wine, vinegar) and is porous, so it needs sealing. Quartz is engineered, non-porous, stain-resistant, and consistent slab-to-slab — the lower-maintenance option, especially with kids. Most kitchens we build use slab quartz on the working surfaces and a marble waterfall island as the statement piece. We'll walk through the trade-offs on the consultation with real samples.

Can you relocate gas lines and add a range hood?

Yes. Gas relocations require a DOB permit in NYC; our long-term NY-licensed master plumber partner pulls the permit under their license, and we handle the inspection sequencing. Range hoods can be vented through the existing hood column (in pre-war buildings often the original servant chimney), through the exterior wall, or through the roof — depending on building type and what the local code allows. We confirm the venting path during the design phase, before cabinetry is ordered.

Do you handle the appliance coordination?

Yes. Once the appliances are spec'd, we coordinate delivery dates with the building, manage the staging area, install the appliances during the cabinetry phase, and handle warranty registration on every installed unit. If you're sourcing from a specific dealer (Sub-Zero / Wolf, Miele, Thermador), we work directly with their installation specialists where required.

Can I keep cooking during the remodel?

For a full kitchen gut, no — once the gas is capped and the cabinetry comes out, the kitchen is offline. Most homeowners set up a temporary kitchen in the dining room or a basement with a hot plate, microwave, and mini-fridge. For partial remodels (cabinet refresh, countertop swap, backsplash-only), we sequence the work to keep the sink and range running through most of the build.

Do you do kitchen remodels in co-ops and condos?

Yes. Co-op and condo kitchens come with the full alteration agreement package — drawings, insurance certificates, contractor disclosures — submitted to the building's managing agent or board. Approval typically takes 2 to 8 weeks. We've handled board approvals across most of the major Manhattan co-ops; we know what each managing agent expects.

Can you match my existing flooring or wall finishes?

We try. If your existing hardwood is on the original floor, we sand and refinish into the new kitchen footprint when possible — same species, same stain, blended at the seam. Where the original is unavailable (discontinued species, water-damaged sections), we'll spec the closest match and frame the transition naturally with a threshold or pattern change.

Project intake

Tell us what you're planning.

Free Consultation

Ready to start? Let’s talk.

Call to walk through your project, or schedule a free consultation — by video if you can’t be on site, in person if you can. We bring sample materials, a measuring kit, and a written scope back to you within a few business days.

Licensed Insured Bonded 10+ years

Mon–Sun · 8 AM–6 PM